Author Topic: Erie Canal Rehabilitation Pictures Embankment Dams 30-39  (Read 95 times)

Doug K

  • ECNA Co-Founder
  • Administrator
  • Hero Member
  • *****
  • Posts: 1073
  • Choosing to Live FREE of Social Media Influences
  • Location: Port Byron NY
    • ECNA US Website
Took a ride along some Embankment Dams from Brockport West. I've decided to document all of the 40 work zone dams that have been part of the initial Embankment Integrity project,.. the EERP Prototype.

For those of you worried about what this embankment work is doing to the "scenic beauty" of the Erie Canal... it's making it better

For those of you hearing that "All of the Trees along the Erie Canal are being cut & sold"... they are not, plenty of trees left as you will see.

For those of you who think this project is about anything other than Embankment Dam Safety... notice the work ONLY cleared the Dams


There is a Work Zone Guide on the last picture showing where these Dams are located... and why some pictures are not included here.







Now I'm not trying to convince you that this dam safety project hasn't resulted in the creation of "unforeseen negative consequences" but one thing is for sure... these new Embankment are safer and more scenic then before. Just take a look at this photo captured at the eastern end of Dam 39



Can you believe there is still a group in Rochester fighting against this Erie Canal Public Safety Program?
« Last Edit: July 06, 2019, 05:53:11 pm by Michael Caswell »

Share on Facebook Share on Twitter


Doug K

  • ECNA Co-Founder
  • Administrator
  • Hero Member
  • *****
  • Posts: 1073
  • Choosing to Live FREE of Social Media Influences
  • Location: Port Byron NY
    • ECNA US Website
Had a chance to get out to see a South Side Embankment in this set...Work Zone 31 Dam... off West Canal Road

This one is about 1/2 mile long



It stretches from West Canal Rd eastward to the Brockport Widewaters.



It's a whole different view if you look from above... Work Zone 31 Dam connects to another further east of the widewaters for a total length just over a mile long. On the exact opposite side is Work Zone 30 Embankment Dam that covers 1.25 miles in distance & 7.5 acres of land.

Two chances for a canal breach minimized with the Embankment Restoration work. But the entire widewater area is an unsafe dam that is too narrow for all that amount of water and is still NOT cleared. It will become part of the new Embankment Integrity Program.